Rb-X200Cm Rig Bar (Sold Separately); Rig Bar/Panel Assembly - Chauvet Professional PVP X6IP Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mounting
RB-X200CM Rig Bar
(Sold Separately)
1.73 in
(44 mm)
12.60 in
(320 mm)
Rig Bar/Panel
Assembly
10
7.09 in
12.60 in
(180 mm)
(320 mm)
6.46 in
(164 mm)
3.54 in
(90 mm)
5.12 in
(130 mm)
Be advised that the RB-X200CM includes 2 eye bolt kits preinstalled.
1. Insert alignment hanger into the alignment hole and push panel forward.
2. Push both male Speego into female Speego connections and turn clockwise to
tighten panel to the rig bar.
3. Reverse the steps above to remove panel from rig bar. Push tab on female Speego
connection to release male Speego
The alignment hanger on the PVP X6IP is designed to temporarily hold the weight
of the panel to allow the user to properly align and tighten the panel into place.
82.20 in
(2088 mm)
78.74 in
(2000 mm)
7.09 in
12.60 in
(180 mm)
(320 mm)
Alignment Hole
7.09 in
12.60 in
(180 mm)
(320 mm)
PVP X6IP User Manual, Rev. 6
1.73 in
(44 mm)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pvp x3

Table des Matières