Power Supply Connection; Switching On And Off; Adjusting The Float Switch; Cleaning And Storage - FLORABEST FRP 350 C2 Traduction Du Mode D'emploi D'origine

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB

Power supply connection

The rain barrel pump you have acquired
is already fitted with a home office (safety)
plug. The pump is designed for connection
to an earthed wall socket with a residual
current operated device (RCD switch) at
230 V ~ 50Hz.

Switching on and off

When submerging the pump, en-
sure that the shut-off tap (
open, to guarantee that the air is
vented from the pump.
1. Open the shut-off tap
(
18).
2. Fully submerge the pump.
3. Insert the plug in the socket. The pump
starts working immediately.
4. To switch off, withdraw the plug from
the socket. The pump stops.
If the water level is too low, the
float switch will automatically
switch off the pump.
Supervise the appliance while it is
in operation in order to be immedi-
ately aware if the automatic cut-out
operates or the pump runs dry, to
limit any damage to a minimum.

Adjusting the float switch

Automatic mode:
The on or off switching point on the float
switch (
 6) can be continuously ad-
justed.
Loosen the screw on the float switch
height adjustment (4) and bring it
46
into the required position (arrow
has to show upwards).
Check the float switch (6). It must
be positioned so that it can lift and
lower freely. The switching point
heights "On" and "Off" must be
easy to reach.
There is a risk of dry running if the
float switch cable (
ed to be too long, particularly if the
18) is
float switch height adjustment
Manual mode:
The pump runs continuously in manual
mode.
Position the float switch (6) as
shown.

Cleaning and storage

Clean and service your appliance on a
regular basis. This will guarantee its opti-
mum performance and a long service life.
Ask our service centre to car-
ry out any work that is not
described in these instruc-
tions. Use only original parts.
There is a risk of injury!
Pull out the power plug before every
maintenance operation. There is a
risk of electrocution or of injury from
moving parts.

General cleaning work

• Clean the pump after every use with
clean water.
 4) is not fitted.
 3) is select-

Publicité

Table des Matières
loading

Table des Matières