4- INSTALLATION OF THE UNIT
4.8- INSTALLATION OF THE DISTRIBUTION DUCT
Air volume
One duct connection:
Two duct connection:
Max. length: 2m
The louver below the distribution duct must be sealed.
Distribution duct
Distribution duct
One way
Distribution duct
Distribution duct
Fresh Air
2-075 AK
300-360m3/h
200-260m3/h
13
Two way