Operation; Replacing The Power Cable; Cleaning, Maintenance And Ordering Of Spare Parts; Disposal And Recycling - EINHELL BG-DP 1340 G Mode D'emploi D'origine

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16
Anleitung_BG-DP_1340_G_SPK7:_
Important!
To rule out danger, this work must be left strictly to a
specialist electrician or Customer Service.

6. Operation

You can put the equipment into operation after you
have thoroughly read the installation and operating
instructions. Pay attention to the following points:
Make sure that the equipment is set up securely.
Check that the discharge line is fitted correctly.
Make sure that the electrical connection is 230 V
~ 50 Hz.
Check that the electrical socket-outlet is in good
working order.
Make sure that no moisture or water can ever
reach the power connection.
Make sure that the equipment does not run dry.
Setting the On/Off switching point:
The ON and OFF switching point of the floating
switch can be adjusted by moving the cable in the
cable holder (Fig. 2).
Check the following before putting the
equipment into operation:
The floating switch must be fitted so that the
switching point height: ON and the switch point
height: OFF can be reached easily and with little
force. Check this by placing the equipment in a
container filled with water and carefully raising
and lowering the floating switch with your hand.
You can then see whether the equipment
switches on and off.
Make sure that the distance between the floating
switch head and the cable holder is not too
smaller than 10 cm (Fig. 2). If the distance is too
small, there is no guarantee that the equipment
will work correctly.
When adjusting the floating switch, make sure
that the floating switch does not touch the bottom
before the equipment is switched off. Important!
Risk of dry running.

7. Replacing the power cable

If the power cable for this equipment is damaged, it
must be replaced by the manufacturer or its after-
sales service or by similarly trained personnel to
avoid danger.
04.08.2011
15:12 Uhr
Seite 13
8. Cleaning, maintenance and ordering
of spare parts
Important!
Unplug the power plug prior to any maintenance
work.
For mobile applications, the equipment should be
cleaned with clear water after every usage.
For stationary installation, it is recommended that
you check the floating switch for proper operation
every three months.
Use a water jet to remove any lint or fibrous
particles that may have become trapped in the
housing.
Remove sludge from the shaft bottom and clean
the shaft walls every 3 months.
Use clear water to remove deposits from the
floating switch.
8.1 Cleaning the paddle wheel
If a lot of deposits collect in the housing, the bottom
part of the equipment must be dismantled as follows:
1. Disconnect the intake cage from the housing.
2. Clean the paddle wheel with clear water.
Important! Do not put down or rest the
equipment on the paddle wheel!
3. Assemble in reverse order.
8.2 Maintenance
There are no parts inside the equipment which
require additional maintenance.
8.3 Ordering spare parts
Please provide the following information on all orders
for spare parts:
Model/type of the equipment
Article number of the equipment
ID number of the equipment
Spare part number of the required spare part
For our latest prices and information please go to
www.isc-gmbh.info

9. Disposal and recycling

The equipment is supplied in packaging to prevent it
from being damaged in transit. The raw materials in
this packaging can be reused or recycled. The
equipment and its accessories are made of various
types of material, such as metal and plastic. Defective
components must be disposed of as special waste.
Ask your dealer or your local council.
GB
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

41.707.40

Table des Matières