reduced. If the universal hose connection (Fig. 1/
Item 1) is used, it should be shortened (as shown
in Fig. 3) to the connection actually used in order
not to reduce the pumping rate unnecessarily.
Flexible hoses must be fastened to the universal
hose connection with a hose clip (not included in
the scope of supply).
The non-return valve (Fig. 3/Item 6) prevents the
water in the hose fl owing back when the pump
is switched off . The use of the non-return valve
reduces the maximum delivery rate.
Water might escape from the ventilation opening
during operation.
Note!
When installing, never hang the equipment by
the discharge line or by the power cable. The
equipment must be hung up by the provided carry
handle or suspension eyelet, or it must rest on the
bottom of the shaft. To ensure that the equipment
works properly, the bottom of the shaft always
must be free of sludge and other accumulations
of dirt. If the water level is too low, the sludge
in the shaft can quickly dry out and hinder the
equipment from starting. It is necessary therefore
to check the equipment regularly (carry out trial
start-ups).
The pump shaft should measure at least 40 x 40 x
40 cm so that the fl oating switch can move freely.

5.2 Mains connection

Danger!
The equipment you have purchased comes with
an earthing-pin plug. The equipment is designed
for connection to a socket outlet with earthing
contact for 230 V ~ 50 Hz. Make sure that the
socket-outlet is suffi ciently fused (at least 6 A)
and in good working order. Insert the power plug
in the socket-outlet and the equipment is ready
for operation.
Anl_GE-SP_4390_N-A_LL_ECO_SPK9.indb 21
Anl_GE-SP_4390_N-A_LL_ECO_SPK9.indb 21
GB

6. Operation

You can put the equipment into operation after
you have thoroughly read the installation and ope-
rating instructions. Pay attention to the following
points:
Make sure that the equipment is set up secu-
rely.
Check that the discharge line is fitted correct-
ly.
Make sure that the electrical connection is
230 V ~ 50 Hz.
Check that the electrical socket-outlet is in
good working order.
Make sure that no moisture or water can ever
reach the power connection.
Make sure that the equipment does not run
dry.
To switch off the equipment, pull the power
plug out of the socket outlet.
Operation of the integrated fl oat switch
(Fig. 4):
ON:
In ON mode the equipment will run continuously
and the water can be sucked up down to a level
of 1 mm. To prevent dry running, this operating
mode is allowed only under supervision. The
equipment must be switched off (pull out the pow-
er plug) as soon as no more water is emitted from
the discharge line.
Please note:
For the equipment to suck up water in ON mode
there must be a minimum depth of 5 mm of water!
Autostart level1 (5 mm): Once this level has
been reached the equipment continues to run
on for a further 30 seconds and then it swit-
ches off automatically.
Autostart level2 (56 mm): Once this level
has been reached the equipment continues
to pump until level 1, runs on for a further 30
seconds and then switches off automatically.
Autostart level3 (103 mm): Once this level
has been reached the equipment continues
to pump until level 1, runs on for a further 30
seconds and then switches off automatically.
- 21 -
24.08.2017 08:46:33
24.08.2017 08:46:33