Preparation; Installation Tailpiece And Intermediate Flange - Vetus BOW2512EI Manuel D'utilisation Et Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
4
Installation
In order to install the tunnel, consult 'Installation recommendations
for bow thrusters' , Vetus art. code 020571.06
For overall dimensions see drawing, page 93.
4.1

Preparation

The bow thruster will be delivered fully as-
sembled. Perform the following steps:
• Remove the propeller.
• Remove all of the screws from the cover
in order to lift out all the packaging from
the motor housing.
• Loosen the 3 bolts (A) in order to lift the
motor and its housing from the interme-
diate flange.
Although shown separately in the dia-
gram, it is not necessary to remove the
packing (B) from the bolts (A).
• Remove the intermediate flange from the
tail piece.
The 2 bushes are only required for trans-
port and are now no longer needed.
4.2

Installation tailpiece and intermediate flange

• Ensure that the plastic shim plate (1) has been positioned on the
tail piece.
• Place one packing (2) between the tail piece and the tunnel.
• Apply a sealant (e.g. polyurethane or silicone) between the tail
piece and packing, and between the packing and the tunnel wall.
• Place the tail piece in the hole in the tunnel.
Any extra packings used should be ones capable of justifying the
tail piece.
*) e.g. Sikaflex®-292.
14
020585.02
The areas in which the electric motor of the bow thruster and
the battery are positioned must be dry and well ventilated.
B
2
1
vetus® Operation manual and installation instructions bow thruster BOW2512EI 'Ignition Protected'
n
ote
A

Publicité

Table des Matières
loading

Table des Matières