Elica EST630SS Guide D'utilisation, D'entretien Et D'installation page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
Mark centers of the fastener locations through the template
to the wall.
IMPORTANT: All screws must be installed into wood.
If there is no wood to screw into, additional wall framing
supports may be required.
5
Remove the template.
6
Drill
3
" (4.8 mm) pilot holes at all locations where screws
1 6
are being installed into wood.
Install the 2 - 5 x 45 mm mounting screws. Leave a
7
(6.4 mm) gap between the wall and the back of the screw
head to slide range hood into place.
"
1
4
(6.4 mm)
Vent cover bracket installation
1
Attach vent cover bracket to wall flush to the ceiling using
2 - 5 x 45 mm screws.
C
Complete preparation
Determine and make all necessary cuts in the wall for the
1
vent system. Install the vent system before installing the
hood. See "Venting Requirements" section.
2
Determine the required height for the home power supply
cable and drill a 1¼" (3.2 cm) hole at this location.
Run the home power supply cable according to the
3
National Electrical Code or CSA Standards and local codes
and ordinances. There must be enough ½" conduit and
wires from the fused disconnect (or circuit breaker) box to
make the connection in the hood's electrical terminal box.
NOTE: Do not reconnect power until installation is complete.
Use caulk to seal all openings.
4
A
A. Ceiling
B. Wall
C. Centerline
B
Install range hood
Using 2 or more people, hang range hood on 2 mounting
1
screws through the mounting slots on back of hood.
"
1
4
C
D
A. Mounting screws
B. Mounting slots
Mark with a pencil the lower mounting holes location.
2
3
Uninstall the hood assembly, and drill
holes at marked locations.
Hang the range hood again on 2 upper mounting screws.
5
Level the range hood and tighten upper mounting screws.
6
Install 2 - 5 x 45 mm lower mounting screws and tighten.
7
Connect Vent System
Install transition on top of hood (if removed for shipping)
1
with 2 - 3.5 x 9.5 mm sheet metal screws.
A
B
1
Fit vent system over the exhaust outlet.
Measure from the bottom of the air deflector to the
2
bottom of the hood outlet. Cut the ductwork at the
measured dimension.
Seal connection with clamps.
3
Check that back draft dampers work properly.
4
A
B
C.
Washers
D.
Lower mounting screws
3
" (4.8 mm) pilot
1 6
A.
B.
Roof outlet
Wall
outlet
Dimension
to measure
Vent transition
3.5 x 9.5 mm
screw
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Est636ss

Table des Matières