System Configuration; Method Of Operation; Better Use - Daikin LRMEQ5AY1 Manuel D'utilisation

Masquer les pouces Voir aussi pour LRMEQ5AY1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
2-2 In the case of
LRLEQ15AY1(E), LRLEQ20AY1(E),
LRMEQ15AY1(E), LRMEQ20AY1(E)
Air outlet
Fan
Air inlet
Heat exchanger
(aluminium fin)
Transmission
wiring
Refrigerant
piping

3. SYSTEM CONFIGURATION

The condensing unit has the following system con-
figuration.
3-1 Air cooled condensing unit
Name
Outdoor unit
Shape
3-2 Other configuration equipment
Name
Unit cooler
Shape
Indoor unit
Name
Freezing
Unit cooler
Shape
For other configuration equipment, refer to the
Operation Manuals of the respective pieces of
equipment.
4
Power supply wires
(to dedicated earth
leakage breaker)
Earth wire
A wire that makes the system
safe by connecting the outdoor
unit to the ground for the
prevention of electric shocks
or fire resulting from electric
leakage.
Indoor unit
Refrigeration
Showcase
Defrost
control
panel
Showcase

4. METHOD OF OPERATION

Preparations
• Turn on all the configuration
equipment.
• Be sure to turn on the power
at least 6 hours before start-
ing the operation of the
equipment for the machinery
protection.
1. Set the RUN switch of the outdoor unit to ON.
Stop
2. Set the RUN switch of the
outdoor unit to OFF.
CAUTION
The unit must go through a stop movement
before the unit is turned power off.
Be sure to turn off the breaker after the RUN
switch is turned off.
Note:
• The use of a remote switch is recommended if the
operation of the unit is stopped frequently.
Request your dealer for the installation of the
remote switch.

5. BETTER USE

5-1 Turn off the power if the unit is not
operated for a long time.
The unit will consume a power of several watts
to several tens of watts if the power is on (see
note).
For the purpose of machine protection, how-
ever, be sure to turn on the power at least 6
hours before resuming the operation of the unit.
Note: The power consumption of the unit varies
with the operating factors, such as the
condensing unit model.
To start operation
REMOTE
OFF
ON
To stop operation
REMOTE
OFF
ON
OFF
English

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lrmeq6ay1Lrmeq8ay1Lrmeq10ay1Lrmeq12ay1Lrmeq15ay1Lrmeq20ay1

Table des Matières