Replacing C 6010 Sealing Ring; Leakage Test; Degas - IKA C 6010 Mode D'emploi

Table des Matières

Publicité

Replacing C 6010 sealing ring

Remove the seal ring (item 11) as shown in the following images.
The new sealing ring has to snap exactly as indicated in following images.
A leak test and pressure testing shall be performed after assembly has been success-
fully completed (see the section "Leakage test").

Leakage test

Perform a leakage test before every combustion process.
Always check the tightness of decomposition vessel after car-
rying out maintenance.
Follow the safety instructions.
• Fill the decomposition chamber in the calorimeter system or using the C 248
oxygen filling station
18
• Remove the decomposition vessel and immerse fully in a container filled with
water
• Check the decomposition vessel for oxygen leaks by watching for bubbles
• If bubbles are seen then the decomposition vessel is not sealed correctly.
• Vent the decomposition vessel and check the seals
Never use a leaking decomposition vessel in the calorimeter.

Degas

For the C 6000, venting of the decomposition vessel
takes place inside the device.
The vent knob is supplied for manual release of tension
in the decomposition vessel. (Even in case of error func-
tion of the filling unit in the calorimeter C 6000 iso / C
6000 gs)
Escaping decomposition gases might
be detrimental to health. Please work
under a fume hood.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

C 6012

Table des Matières