Télécharger Imprimer la page

dirna Bergstrom bycool green line COMPACT ND Instructions De Montage page 26

Publicité

Les langues disponibles

Les langues disponibles

COMPACT
EN
14
Fasten supports tightening nuts until outside
EPDM joint (Point 4a) of equipment is
compressed, between 3 and 6 mm; joint
EPDM must stay with a thickness of 19 and
22 mm.
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with
Compact base, as indicated on diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
EPDM gasket is
compressed between 3
14
and 6 mm.
Tighten (4) M8 nuts to support and (4) to Unit
15
base.
EPDM gasket
10 mm*
(*) (approx. after tightening)
Base
Bracket
26
Air conditioning for vehicles
Check compression
thickness using a
tape measure in the
four corners.
EPDM gasket
14
15

Publicité

loading