Télécharger Imprimer la page

Siemens RVL479 Instructions D'installation page 27

Masquer les pouces Voir aussi pour RVL479:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
Settings on the "Heating engineer's" level
Press
and
simultaneously for 3 seconds, thus activating the "Heating engineer's" level
for displaying the plant type and for setting the plant-related variables.
Plant type
Operating line 51 displays the ready selected plant type 1. All required functions are activated
and the associated operating lines will show up:
51
Plant type
Plant type 1 – Heating circuit control with mixing group
BUS (LPB)
B9
Y1
B7
A6
Room unit
B1
Flow temperature sensor
B5
Room temperature sensor
B7
Return temperature sensor
B71
Return temperature sensor
B9
Outside sensor
Building Technologies
Display function
N1
A6/B5
M1
B1
E2
E2
Load (space)
LPB
Data bus (Local Process Bus)
M1
Heating circuit pump
N1
Controller RVL479
Y1
Actuator for heating circuit
74 319 0620 0 a
the data bus
120 = flow alarm
140 = wrong controller address
(LPB)
142 = no partner unit on the
data bus (LPB)
1
17.04.2008
en
27/152

Publicité

loading