Start-Up And Operation - Nibe GBM 10-15 Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
maximum length* of the fl ue gas
discharge pipe ø 80 mm
115 m
* Straight length" means without bends, drainage terminals or joints.
"SEALED" INSTALLATION (TYPE C)
The boiler must be connected to concentric or twin fl ue gas discharge pipes
and air suction pipes, both leading outdoors. The boiler must not be operated
without them.
Concentric pipes (ø 60-100 mm) (fi g.18)
The concentric pipes can be placed in the most suitable direction according to
installation requirements, complying with the maximum lengths indicated in
the table.
Arrange the fl ue gas discharge pipe so it slopes by 1% towards the boiler.
Non-insulated outlet pipes are potential sources of danger.
The boiler automatically adapts the purging to the type of installation
and the length of the pipe.
Do not obstruct or choke the combustion air suction pipe in any way.
For installation, follow the instructions supplied with the kit.
Horizontal
straight length *
concentric pipe ø 60-100 mm
7,8 m
* Straight length" means without bends, drainage terminals or joints.
Vertical
straight length *
concentric pipe ø 60-100 mm
8,8 m
* Straight length" means without bends, drainage terminals or joints.
Concentric pipes (ø 80-125)
For this confi guration, the special adaptor kit must be fi tted. The concentric pi-
pes can face in the direction most suitable for installation requirements. For in-
stallation, follow the instructions supplied with the specifi c condensing boilers
kits.
straight length *
concentric pipe ø 80-125 mm
14,85 m
* Straight length" means without bends, drainage terminals or joints.
Twin pipes (ø 80 mm) (fi g. 19)
The twin pipes can face in the direction most suited to the installation require-
ments.
For installation, follow the instructions supplied with the specifi c accessory kit
for condensing boilers.
Arrange the fl ue gas discharge pipe so it slopes by 1% towards the boiler.
The boiler automatically adapts the purging to the type of installation
and the length of the pipes. Do not obstruct or choke the pipes in any
way.
Refer to the graphs to fi nd the maximum lengths of the single pipe.
The use of longer pipes reduces the boiler output.
maximum straight* length
twin pipes ø 80 mm
70+70 m
* Straight length" means without bends, drainage terminals or joints.
pressure drop
45° bend
90° bend
1 m
1,5 m

4 - START-UP AND OPERATION

NIBE GBM 10-15 wall-mounted condensation boiler is designed for the produc-
tion of heating hot water for close vent tank
pressure drop
The control panel (fi g. 9) contains the main boiler control and management fun-
ctions.
45° bend
90° bend
1,3 m
1,6 m
pressure drop
45° bend
90° bend
The main input given to the heater is only the on-off signal; the target fl ow tem-
perature of the heater is 80 °C not modifi able.
1,3 m
1,6 m
The reset of the alarms must be done directly on the heater control board rota-
ting the main selector as described in the specifi c section.
4.1 - Switching on the appliance
Switch on the boiler as follows:
- open the gas tap under the heater by turning it anti-clockwise
- open any water taps installed between heater and tank
- turn on the general switch of the system and then turn the function selector
pressure drop
45° bend
90° bend
After being powered, the boiler begins an automatic vent cycle lasting approxi-
mately 2 minutes.
1,0 m
1,5 m
During this phase the three LEDs light up alternatively and the symbol
shown on the display (fi g. 22).
Working the boiler
The heater remains on stand-by until the burner ignites as a result of a demand
for heat from the manager device.
The indicator LED (1 - fi g. 1), located on the left-hand side of the panel, lights up
with a fi xed green light to indicate the fl ame is present.
The heater continues to work until the temperature (80 °C) - fi g. 24 - have been
reached and the demand for heat remains activated, then returns to "stand-by".
In the event of a starting or operating fault, the boiler performs a "SAFETY STOP":
the green indicator LED on the control panel goes out, a fault code fl ashes on
the display control board and a red indicator LED (fi g. 27) lights up in the event
of a shutdown.
To identify the fault codes and reset the boiler, consult the light symbols and
faults section .
Reset function
pressure drop
To reset the boiler, turned the function selector (3 - fi g. 1) to
45° bend
90° bend
conds and then move it to the ON position and check that the red indicator LED
has gone out (fi g. 27).
1,0 m
1,5 m
At this point, the boiler starts automatically if correct operating conditions have
been restored; when the burner ignites, the indicator led lights up wit fi xed gre-
en light and the display indicates the instantaneous operating temperature.
If the boiler continues not to work, call in the local Technical Assistance Service.
4.2 Switching off
Temporary switch-off
In case of absence for short periods of time, set the function selector (3 - fi g. 1)
to
In this way (leaving the electricity and fuel supplies enabled), the boiler is pro-
tected by the following systems:
Anti-frost device: when the temperature of the water in the boiler falls below
6
130
120
110
100
90
80
70
60
50
40
30
20
10
0
0
10
20
30
40
50
60
70
Suction pipe length (m)
The heater must be controlled by the manafer device by means of
a controlcontact.
The appliance comes ready to be connected to the manager device,
therefore if this cable is not connected there is no possibility to switch
on the heater.
When the cable is connected to heater the manager device becomes
the master control for on and off status of the heater.
to ON position.
(OFF).
80
90
100
110
120
130
140
150
, wait for 5-6 se-
160
170
is

Publicité

Table des Matières
loading

Table des Matières