Scope Of Delivery; Accessories; Description And Function; Description Of The Product - Wilo VeroLine-IP-Z Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
English
Fluids
5.3

Scope of delivery

5.4

Accessories

6

Description and function

6.1

Description of the product

7

Installation and electrical connection

Safety
7.1

Installation

Preparation
20
If water/glycol mixtures with up to 40% glycol (or fluids with a differ-
ent velocity to pure water) are used, the pump data must be corrected
to match the higher viscosity, regardless of the percentage mixture
relationship and the fluid temperature. The motor power must also be
adjusted if necessary.
• Only use mixtures with corrosion inhibitors. The respective manufac-
turer's instructions are to be observed!
• The fluid must be sediment-free.
• Wilo's approval must be obtained for the use of other fluids.
NOTE
Always read and follow the material safety data sheet for the fluid
being pumped!
• IP-Z pump
• Installation and operating instructions
Accessories must be ordered separately:
1
• G1
/
x G2 adapters
2
For a detailed list, consult the catalogue/price list.
Single-stage glanded circulation pump in in-line design with screwed
connection. Suitable for pipe installation (direct installation in pipe
system). With stainless steel pump housing and NORYL impeller. The
motor is aerated at the free shaft end. The shaft bushing is sealed by
a maintenance-free, force-flushed mechanical seal.
DANGER! Risk of fatal injury!
Incorrect installation and improper electrical connections can be
life-threatening.
• Have the electrical connections established by approved electri-
cians only, in compliance with the applicable regulations!
• Adhere to regulations for accident prevention!
CAUTION! Risk of property damage!
Danger of damage due to incorrect handling.
• Have the pump installed by qualified personnel only.
See Fig. 1:
1 Boiler
2 Heating circuit feed pump
3 Drinking water storage tank
4 Hot water taps
5 Domestic hot water circulation system
6 Stop valve
7 Non-return valve
8 Safety group (pressure compensation valve + gate valve)
9 Cold water inlet
10 Heating circuit feed
11 Heating circuit return
12 IP-Z pump
• The pump should only be installed after completion of all welding and
soldering work and, if necessary, flushing of the pipe system. Dirt can
cause the pump to fail.
WILO SE 11/2017

Publicité

Table des Matières
loading

Table des Matières