Technical Specifications - BFT LUX BT 2B Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
2) GENERAL INFORMATION
Strong, compact hydraulic piston, available in various versions depending on
specific needs and field of use. There are models featuring hydraulic locking
and non-locking (reversible) models that need a solenoid lock to keep them in
position.
Operating force is adjusted with extreme precision by means of the control unit's
electronic control. Operation at the end of travel is adjusted electronically in the
control panel.

3) TECHNICAL SPECIFICATIONS

Power supply (*)
Max. power input
Max. pressure
Pump delivery rate
Operating force
Pulling force
Ambient temperature range
Impact reaction
Manual operation
Protection rating
Actuator weight
Overall dimensions
Oil
(*) Special supply voltages to order.
Table 1:
MOD.
LOCKING TYPE
ACTUAL TRAVEL TIME
LEAF MAX.
(m)
(Kg)
TRAVEL mm
usable
total
WARNING: With leaves over 3 metres long, the solenoid lock must be
used and locking devices must be opened (Fig. M Ref. 2)
4) TUBE ARRANGEMENT Fig. A
5) PILLAR FASTENINGS INSTALLATION DISTANCES Fig. B
6) INSTALLATION DIAGRAM Fig. C
P
rear bracket fastening to pillar
F
front fork fastening leaf
a-b distances for determining bracket "P" fastening point
C
value of fastening centre-to-centre distance (see Fig. Q)
D
gate length
X
distance from gate axis to corner of pillar
Z
value always greater than 45 mm (b - X)
kg
max. weight of leaf (Table 1)
leaf opening angle
α°
7) FASTENING OF FITTINGS TO PILLAR Fig. D
8) POWER CABLE Fig. E
9) ATTACHING MOTOR TO FASTENING ON PILLAR Fig. F
10) MAXIMUM TILT Fig. G
11) ENCODER ROD ASSEMBLY Fig. H
12 -
LUX BT 2B - LUX G BT 2B
INSTALLATION MANUAL
24V
300W
30 bar
1,2 l/min.
3000 N
2600 N
- 20°C to 60°C
electronic clutch (with control panel)
release key
IP 55
LUX BT 2B: 8,4 kg
LUX g BT 2B: 9,3 kg
Fig. Q
Idrolux Winter
LUX BT 2B
LUX G BT 2B
Hydraulic
Hydraulic
14 sec.
2 0 sec.
2
5--2
300
300/800
270
392
290
412
12) CORRECT INSTALLATION Fig. I
Correct installation entails maintaining a rod stroke margin of approx. 5-10 mm
to avoid possible trouble with operation.
13) FASTENING OF FITTINGS TO LEAF Fig. L
14) LOCKING SETTING Fig. M
15) COVER POSITIONING Fig. N
16) ELEASE COVER FASTENING Fig. O
17) MAIN PARTS OF AUTOMATED SYSTEM Fig. P
M) 24V permanent magnet motor
P) Lobe pump
D) Control valve assembly
C) Cylinder with piston
E) Linear Encoder
Components provided: fittings attached to pillar and gate - release key - instruc-
tion manual.
18) TIPS FOR SPECIAL INSTALLATIONS
With the leaf fully open, create a recess to accommodate the operator.
Fig. R gives the minimum dimensions of the recess for the various LUX BT 2B -
LUX G BT 2B models.
If distance "b" is greater than the values given in the installation tables:
- create a recess in the pillar Fig.S
- move the leaf so that it is flush with the pillar Fig.T.
19) LEAF STOPS AT GROUND LEVEL
For the actuator to work properly, it is advisable to use stops "F" to stop the leaves
both when they are open and closed, as illustrated in Fig.U.
The leaf stops must prevent the actuator rod from reaching the end of its tra-
vel.
20) TOPPING UP OIL Fig. V.
An oil change is recommended every 5 years.
21) MANUAL OPENING (See USER GUIDE -FIG.1-).

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lux g bt 2b

Table des Matières