Filling And Venting - Wilo Star-Z NOVA Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
Installation
Image 5
18

5.3 Filling and venting

1. Fill the system.
2. The pump rotor space vents automatically
after a short time in operation. This may cause
noise. If necessary, switch off and on repeat-
edly to speed-up the venting process. Dry
running for short periods will not harm the
pump.
Open the Wilo-Connector as follows:
WILO SE 05/2021

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Star-z nova t

Table des Matières