Cillit Impulsor Optronic F 3 Instructions De Montage Et D'utilisation page 13

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
Impulsor Optronic F mineral substance metering
units can be installed in horizontal and vertical
water pipes. Leave sufficient space for replacing
the container when installing the Impulsor
®
Optronic
Module F3 compact unit (see Fig. 3).
It is advisable to install shut-off valves immedi-
ately up- and downstream of the unit. A 50cm
inspection pipe should be installed horizontally in
the cold water pipe and in the hot water pipe for
checking the efficacy of metering. The pipes should
be made of the same material and have the same
dimensions as the water pipe, be easy to change,
and be situated at least 2m away from the injection
point.
Note DIN 1988 part 4 when metering Quantophos
Cu2.
Quantophos Cu2 can only be metered in water
up to a limit value of 25 mg/l free carbon dioxide
(base capacity up to pH 8.2 = 0.6mol/m
Note: If water is needed for filling a swimming
Note:
Note:
Note:
Note:
pool, it must be taken upstream
upstream
upstream
upstream from the injection
upstream
point.
The water pipeline upstream from the metering
unit must be flushed thoroughly before installing
®
Impulsor Optronic
module mineral substance
metering units.
Installation
Installation
Installation
Installation
Installation
Connect the unit to the HydroModul system or a
separate connection module as follows:
1. Turn the blue retaining ring to the left limit stop.
2. Press the prongs of the unit into the spaces
provided and then rotate the device 45°
clockwise to the limit stop.
3
).
3. Use two hands to pull the blue retaining ring
towards the device until it clicks into place.
The device cannot be rotated unintentionally.
To release the metering unit, press the retaining
ring towards the connecting module.
GB GB
GB GB
GB
1 3
1 3
1 3
1 3
1 3

Publicité

Table des Matières
loading

Produits Connexes pour Cillit Impulsor Optronic F 3

Table des Matières