Assembly; Operation - Husqvarna Soff-Cut 150 Manuel D'utilisation

Masquer les pouces Voir aussi pour Soff-Cut 150:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Introduction
WARNING: Before you assemble the
product, you must read and understand the
safety chapter.
WARNING: Remove the spark plug cable
from the spark plug before you assemble the
product.
Introduction
WARNING: Before you operate the product,
you must read and understand the safety
chapter.
Basic working techniques
Contraction joints and joint spacing
As concrete hydrates or cures and begins to set, it
develops internal stresses which may cause random
cracks.
Random cracks cast doubt on the quality and
workmanship of the concrete. Contraction joints are cut
in concrete to relieve these stresses before they seek
their own relief in the form of random crack.
The Soff-Cut Ultra Early Entry system controls random
cracking through the early timing of a saw cut at
predetermined locations to create weakened planes in
the concrete that subsequently crack at the bottom of
the cut to relieve stress.
Sawed contraction joints must be a minimum of ⅛ of the
concrete depth and a minimum of 25 mm (1ʺ) deep.
Saw contraction joints when the concrete holds the
weight of the product and the operator. Make sure that
the product does not make marks on or cause damage
to the concrete.
There are many possibilities for joint layout. Joint layout
should be provided, the saw contractor should submit a
detailed joint layout for approval prior to cutting.
There are many conditions that have an effect on joint
spacing.
Concrete thickness.
Type, amount and location of reinforcement.
Shrinkage potential of concrete-cement (type,
quantity), aggregate (size, quantity, quality), water to
cement ratio, admixtures, concrete temperature.
Base friction.
Slab restraints.
12

Assembly

To assemble the cutting blade and the
skid plate
1. Assemble the cutting blade. Refer to
cutting blade on page 18 .
2. Assemble the skid plate. Refer to
blade on page 18 .

Operation

Layout of foundations, racks, pits, equipment pad,
trenches, etc.
Environmental factors - temperature, wind, humidity.
Methods and quality of concrete curing.
Generally, contraction joint patterns should divide slabs
into approximate square panels per the recommended
spacing shown in the table.
Concrete thickness, mm
(in.)
90 (3.5)
100, 114 (4, 4.5)
125, 140 (5, 5.5)
150 (6) or greater
At all intersecting cross cuts, install Husqvarna joint
protectors at each joint to prevent joint damage. Install
an additional joint protector where the right wheel will
cross the joint to prevent concrete damage.
Maximizing the Soff-Cut system
"The timing of concrete operations - especially finishing
and jointing - is critical... Failure to address this issue
can contribute to undesirable characteristics in the
wearing surface as cracking..." (Extract from the
foreword of the American Concrete Institute (ACI) 302.1
R-96.)
The Soff-Cut Ultra Early Entry system has revolutionized
the method used to control random cracking.
In order for an operator to do a satisfactory job using the
Soff-Cut system, the following criteria must be met:
A Soff-Cut Ultra Early Entry dry up-cut saw.
A Husqvarna Soff-Cut dry-cutting diamond blade.
A Husqvarna anti-ravel skid plate installed with every
new diamond blade.
An operator skilled in using the Soff-Cut Ultra Early
Entry cutting system.
To install a
To install a cutting
Maximum spacing, m (ft.)
2.4 (8)
3.0 (10)
3.6 (12)
4.5 (15)
714 - 004 - 06.07.2021

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Soff-cut 150 d

Table des Matières