Epson ELPMBP06 Instructions D'installation page 7

Trousse de remplacement de dalle de plafond suspendu à connexion rapide
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
9.
Rotate large and small circular plates to position extension
column support to the following location (See Figure 4):
A.
REPLACEMENT OF EXISTING TILE:
Position according to marked framework.
B.
INSTALLATION ON TOP OF EXISTING TILE:
Position over ceiling tile hole.
(A)
11
Figure 4
10. Tighten clamp screws (loosened in Step 7).
11. OPTIONAL STEP FOR INSTALLATION ON TOP OF
EXISTING TILE:
Mark location of electrical cutout on ceiling tile with pencil.
(See Figure 4)
12. Examine ceiling structure (concrete, steel truss, or wood)
above ELPMBP06 assembly (A) to identify four support
cable anchor locations. Each location should be
approximately 15° outboard of support holes in tray (A).
(See Figure 5) Mark locations with pencil.
15°
12
x 4
x 4
15°
x 4
Figure 5
13. Remove ELPMBP06 assembly (A) and ceiling tile (if
14. OPTIONAL STEP FOR INSTALLATION ON TOP OF
SUPPORT CABLE INSTALLATION
9
WARNING:
for this component can result in serious personal injury or
damage to equipment! It is the installer's responsibility to
make sure the structure to which this component is attached
can support five times the combined weight of all equipment.
Reinforce the structure as required before installing the
component.
Solid Concrete Ceiling Structure
WARNING:
sound solid concrete with a minimum thickness of 1.75"
(44.5mm) or greater. Installation into hollow concrete block,
mortar, or concrete that exhibits cracking, spalling, or other
defects may result in failure of anchor and serious personal
injury or damage to equipment!
1.
(A)
2.
WARNING:
failure of anchor and serious personal injury or damage to
equipment!
installed).
EXISTING TILE:
Cut electrical box opening in ceiling tile at marked location.
Install UL Listed Raco 560 or equivalent UL Listed electrical
box (not included) to ELPMBP06 (A) following instructions
included with electrical box.
Failure to provide adequate structural strength
Anchors must be installed into structurally
Drill 1/4" diameter x 1-3/8" deep hole at each marked cable
anchor support location (See Figure 6). Ensure hole is at
least 2-1/2" from nearest concrete edge. Remove debris
from hole.
1
2
1/4"
(D)
Figure 6
Tap anchor (D) into each hole to a depth of at least 1". (See
Figure 6).
Failure to properly set anchor may result in
ELPMBP06
3
4
(C)
7

Publicité

Table des Matières
loading

Table des Matières