STEP 7: Align and insert Mesh Guard – Lower (D) into the inside slots of Support Bar – Lower (F). Repeat this step to insert
2pcs Mesh Guard – Lower (D).
STEP 9: Same as Step 7 to align and Insert 3pcs Mesh Guard – Upper (C) into the inside slots of 3pcs Support Bar – Upper
(E).
STEP 8: Unload 4PCS Guard Fastening Plates by un-
screwing 4PCS screws and washers from FLAME
SCREEN (B).
EN
9