Ceiling Hood Install Preparation - Faber HILTIS36WHNB Instructions D'installation

Table des Matières

Publicité

CEILING HOOD INSTALL PREPARATION

Do not make any cutouts until you have decided whether this installation will be: ducted or non-ducted
and wiring has been prepared based on based on blower type.
3
Use a plumb line to mark the center of the
range on the ceiling.
5
• For all installations, an access point to the hood must be created for installation and future maintenance
of the hood.
• Put a thick, protective covering over cooktop to protect from damage or dirt.
• Use the mounting template on the ceiling to determine placement of mounting screws on the ceiling.
• Mark the center of the holes in the ceiling template.
• Determine and make necessary cuts for the ductwork.
• Install ductwork before mounting the hood.
• Determine the proper location for the Power Supply Cable as indicated on the Template.
• Use a 1 1/4" Drill Bit to make this hole.
• Run the Power Supply Cable. Use caulking to seal around the hole.
• A knockout for threading through the Power Supply from the ceiling is located on the top of the Range
Hood.
• Do not connect the Power Cable to the Wiring Box or power up the hood at this time.
• Run enough power cable from the ceiling to reach the wiring box on the hood.
4
1
"
1/4
Mark the centers.
WARNING
!
DUE TO THE SIZE AND WEIGHT OF
THIS Range Hood, THE SUPPORT
H
MUST BE FIRMLY ATTACHED TO
THE CEILING. For plaster or sheet
rock ceiling, the support must be
attached to the joists. If this is not pos-
sible, a support structure must be built
behind the plaster or sheet rock. The
manufacturer assumes no responsibil-
ity for injury or damage caused by
improper installations.
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hiltis36ssnb

Table des Matières