Ceiling Hood Preparation - Faber Cylindra Isola Instructions D'installation

Masquer les pouces Voir aussi pour Cylindra Isola:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CEILING HOOD PREPARATION

• Use the mounting template on the ceiling to determine
3
placement of mounting screws on the ceiling.
• Mark the center of the holes in the ceiling template.
• Determine and make necessary cuts for the ductwork. The duct opening
is shown on the mounting template. Install ductwork before mounting
the hood.
• Determine the proper location for the Power Supply Cable as indicated
on the template. Use a 1 1/4" Drill Bit to make this hole. Run the Power
Supply Cable. Use caulking to seal around the hole.
• A knockout for threading through the Power Supply from the ceiling is
located on the top of the frame. Do not connect the Power Cable to the
Wiring Box or power up the hood at this time. Run enough power cable
from the ceiling to reach the wiring box.
14
1
"
Ø 10 mm
1/4
x4
!
WARNING
DUE TO THE SIZE AND
WEIGHT OF THIS RANGE
HOOD, THE SUPPORT MUST
BE FIRMLY ATTACHED TO
THE CEILING. For plaster or
C
sheet rock ceiling, the support
must be attached to the joists.
If this is not possible, a support
structure must be built behind
the plaster or sheet rock.
The manufacturer assumes
no responsibility for injury or
damage caused by improper
installations.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cylnis15ss600

Table des Matières