Free Room; Installation - Daikin ZANOTTI RCV101001F Notice De Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.4 Free room

When installing the unit leave enough free room to allow opening, correct use and easy maintenance in
safe conditions.
6.5 I nstallation
A) Prepare a opening with suitable dimensions in the cold room wall (see pictures above). Position the
unit onto the cold room wall inserting the evaporator section in the opening.
B) Fix the unit using the screws supplied.
Hole
Inject silicone on the
whole conveyor perimeter
20

Publicité

Table des Matières
loading

Table des Matières