Télécharger Imprimer la page

Yamaha Motor 40 Manuel D'installation page 52

Publicité

1
2
43
6. Adjust:
• Throttle cable joint position
Adjustment steps:
• Turn the throttle grip to the fully closed
position.
• Contact the throttle control lever 1 to the
fully closed stopper 2.
• Adjust the position of the cable joint 3
until its hole aligns with the set pin 4.
• Install the clip 5, and then tighten the
locknut 6.
WARNING
The cable joint must be screwed in a
minimum of 8.0 mm (0.31 in).
7. Check:
• Throttle operation
Unsmooth operation → Adjust.
Checking steps:
• Turn the shift lever to the neutral position.
• Fully open and close the throttle several
times.
• Check that the throttle valve fully opens
and closes.
8. Connect:
• Wiring harness coupler 1
• Warning indicator lead coupler 2
E

Publicité

loading

Ce manuel est également adapté pour:

50607090F30F40 ... Afficher tout