Télécharger Imprimer la page

Cascade E-SERIE Sideshift Instructions De Montage page 4

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
I
NSTALLATION
Follow the steps shown to install the Clamp on the truck.
Read and understand all WARNING and CAUTION state-
ments. If you don't understand a procedure, ask your
supervisor, or call the nearest Cascade Service Depart-
ment for assistance.
1
Attach overhead hoist
A
Remove banding, set Clamp upright on
pallet with hooks overhanging end.
B
Remove bolt-on lower mounting hooks
(if equipped).
CL0096.ill
2
Unlock quick-change lower
mounting hooks
A
Remove pin and drop hooks into unlocked
position.
B
Re-install pin in lower hole.
B
4
A
Guide
®
e
a d
s c
c a
- 1
1 4
5 5
6 7
C -
LH lower
Hook
Pin
A
B
16 mm offset
on top pro-
vides max.
clearance.
Tighten Capscrews:
Class 2/3 Mounting – 225 Nm.
WARNING: Make sure overhead
hoist has rated capacity of at least
1600 kg.
NOTE: Guides can be reversed to
reduce hook-to-carriage clearance
(See lower hook installation, Step 6).
CL0097.ill

Publicité

loading

Produits Connexes pour Cascade E-SERIE Sideshift