Dell PowerEdge SC1425 Guide D'installation page 23

Masquer les pouces Voir aussi pour PowerEdge SC1425:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6
Holding the left mounting rail at the location you marked, position the flush-mount
mounting flange against the front of the vertical two-post rack and secure it to the two-post
rail with two 12-24 x 0.5-inch pan-head Phillips screws (see Figure 1-14).
7
Slide the adjustable-mounting bracket so that it is against the back of vertical two-post rack
and secure it to the two-post rail with two 12-24 x 0.5-inch pan-head Phillips screws
(see Figure 1-14).
8
Repeat step 6 and step 7 to install the right mounting rail in the rack.
9
Using a 3/8-inch wrench or nut driver, tighten the nuts on the adjustable mounting brackets
on both mounting rails.
Figure 1-14. Installing the Mounting Rails for Flush-Mount Configuration
two-post open-frame rack
12-24 x 0.5-inch pan-head
Phillips screws (4 per rail)
mounting rails (2)
Rack Installation Guide
1-21

Publicité

Table des Matières
loading

Table des Matières