Installing The Releasable Tie Wraps - Dell PowerEdge SC1425 Guide D'installation

Masquer les pouces Voir aussi pour PowerEdge SC1425:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4
Push the system into the mounting rails until the system stops (see Figure 1-7).
5
Push in and turn the thumbscrews on each side of the front chassis panel to secure the system
to the rack.
6
Install the optional front bezel (if applicable). See the procedures for installing the bezel in
the documentation provided with your system.
NOTE:

Installing the Releasable Tie Wraps

The two releasable tie wraps are used to secure your system's cables to the mounting rails.
1
Locate the releasable tie wrap attachment points located on the two back mounting-bracket
flanges (see Figure 1-8).
2
Push the tie wrap's fastener through the attachment point.
3
Push the tie wrap's plunger until it snaps to secure the tie wrap to the mounting rail.
4
Using the releasable tie wrap, secure your system's cables to the mounting rail.
Figure 1-8. Installing the Releasable Tie Wraps
1-14
Rack Installation Guide
Figure 1-7 applies to the RapidRails, VersaRails, and two-post rack kits.
mounting rails (2)
releasable tie wraps (2)

Publicité