dirna Bergstrom Bycool DINAMIC 1.1 Instructions De Montage page 36

Volvo fh euro 6
Masquer les pouces Voir aussi pour Bycool DINAMIC 1.1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

DINAMIC 1.1
EN
Introduce the drainage pipe in the drainage
12
valve and secure to the vehicle plating along
with the piping and cabling, using the supports,
adhesive and plastic flanges. Caution: clean
the surface of the plating before attaching
the supports.
Connect the power cable terminal to the unit
13
terminal and secure to the original stud using a
3/8 nylon clamp and M6 nut.
Caution: clean the surface of the plating
before attaching the supports.
Connect condenser fan screw terminals of the
14
protective housing with condensing unit screw
terminals.
13
36
12
13
®
12
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bycool green line dinamic 1.1

Table des Matières