Installation; General; Preparing The Unit For Installation - Hatco CWB Série Manuel D'installation Et D'utilisation

Cuves réfrigérées libre service
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

General

Refrigerated Drop-In Wells are shipped from the factory
completely assembled and ready for use. Use the following
information and procedures to prepare the unit and installation
site.
WARNING
ELECTRIC SHOCK HAZARD:
• Plug unit into a properly grounded electrical receptacle
of the correct voltage, size, and plug configuration. If
plug and receptacle do not match, contact a qualified
electrician to determine and install proper voltage and
size electrical receptacle.
• Unit is not weatherproof. Locate unit indoors.
FIRE HAZARD: Install unit with a minimum of 2" (51 mm)
of space between all sides of condensing unit and any
combustible surfaces.
This unit must be installed by qualified, trained installers.
Installation must conform to all local electrical and
plumbing codes. Check with local plumbing and electrical
inspectors for proper procedures and codes.
Locate unit at the proper counter height in an area that is
convenient for use. Location should be level and strong
enough to support weight of unit and contents.
NOTICE
Transport and install unit in upright position only. Failure
to do so may result in damage to refrigeration system.
This unit is designed for use in environments where ambient
temperature is between 65°F (18°C) and 86°F (30°C).
When shipped during cold weather months, store unit in
proper ambient temperature environment for 10 hours to
prevent compressor and/or refrigerant line damage. If unit
is turned on and there is excessive noise and vibration, turn
off immediately and allow additional warm up time.
Provide louvered or grill-style openings with a minimum
size of 12" x 12"/144 square inches (31 x 31 cm/
961 square cm) in the cabinetry in front of and behind the
condensing unit for proper ventilation. Failure to provide
adequate air flow through the condensing unit may cause
unit failure and will void the unit warranty.
Do not locate unit in an area subject to excessive
temperatures or grease from grills, fryers, etc. Excessive
temperatures could cause damage to the unit.
All Refrigerated Drop-In Wells are shipped in a shipping frame
for protection and stability. Keep the unit in the shipping frame
until the unit and the installation site are completely prepared
for the unit to be installed.
1. Remove all external packaging from the unit.
2. Remove tape, protective packaging, and literature from all
surfaces of the unit.
NOTE: To prevent delay in obtaining warranty coverage, complete
online warranty registration. See the IMPORTANT
OWNER INFORMATION section for details.
Form No. CWBM-0717
CAUTION

Preparing the Unit for Installation

The orientation of the condensing unit on all CWB models can
be adjusted to match the layout of the installation site. It can be
rotated 90° or 180° from its factory-installed position. On CWB-
4, -5, and -6 models, the condensing unit also can be mounted
in several positions between the center of the well and the
evaporator coil connections.
Survey the installation site and determine if adjustment to the
orientation and/or position of the condensing unit is necessary.
Take into account the need for louvered or grill-style openings in
the cabinetry to provide proper ventilation for the unit as well as
access to the control panel. One of these ventilation openings
must be in front of the condensing coils with the other on the
opposite side. If multiple refrigerated wells are installed in the
same counter, each unit should intake cool air and expel hot air.
If adjustment to the orientation and/or position of the condensing
unit is necessary, use the following procedure(s).
Rotating the Condensing Unit
1. Remove the two control panel bolts that secure the control
panel to the condensing unit support frame. Set aside the
control panel.
2. Place blocks underneath the condensing unit for support
during rotation.
3. Remove the 16 support bolts (four on each support) that
secure the condensing unit vertical supports to the upper
support brackets on the underside of the well enclosure.
4. Rotate the condensing unit 90° or 180°, depending on the
installation site.
NOTE: Do not rotate the condensing unit in a direction that will
put the evaporator lines or any other obstruction in front
of the condenser coil.
5. Reattach the vertical supports to the upper support brackets
on the well enclosure using the 16 support bolts.
6. Reattach the control panel to the condensing unit support
frame using the two control panel bolts.
Control Panel
Control
Panel Bolt
Rotating the Condensing Unit
7

INSTALLATION

Upper
Support
Bracket
Vertical
Support
Condensing Unit
rotated 90°.
Hoses removed for clarity.
Vertical
Support
Bolt

Publicité

Chapitres

Table des Matières
loading

Table des Matières