Very Important - dirna Bergstrom bycool green line DINAMIC 1.2 Instructions De Montage

Masquer les pouces Voir aussi pour bycool green line DINAMIC 1.2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
DINAMIC 1.2
8
On the studs, thread (4) M6 nuts with (4) flat washers
Ø 6, which should be level with the cover.
SEE ATTACHED DIAGRAM

VERY IMPORTANT

In the case of slanting upholstery, the evaporator
unit must be vertical to prevent the condensation
water from dropping onto the upholstery.
Upholstery
9
Pass the waste water pipe through the bore of
the evaporator base and connect to the tray.
10
Pass the cabling through the Ø 35 bore towards
the exterior.
OPERATIONS VALID FOR ALL MODELS
Evaporator
bracket
Wastewater
tray
10
23
Air conditioning for vehicles
Lorry sheet
OUTSIDE
M6 self-blocking
M6 Nut
nut
Protector cap
M6 Stud
Wide ring flat
washer
Wide ring
flat washer
Rubber washer
9
EN
ES
Upholstery
INSIDE
Evaporator
M6 Nut
base
(leave at
upholstery height)
M6 Nut
Wide ring
flat washer
8
10

Publicité

Table des Matières
loading

Table des Matières