Hauff-Technik HRD 80-FUFA/o/u Instructions De Montage page 28

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

HRD (D)-Z-FUF/FUFA-KMB
6
Installation and application information for Z-HRD (D)-FUF/FUFA-KMB accessory set:
Sealing according to DIN 18195-6 with fixed/loose flange and KMB
(polymer-modified bituminous thick coatings)
The HRD (D)-FUFA installation instructions must be followed for installation with dowels.
Fit the supplied protective silicone caps to the M20 instal-
1
lation screws of the fixed flange in order to protect the
thread from dirt.
Use a suitable levelling mortar to level out any uneven
2
patches around the flange.
Then start the substrate treatment in accordance with the
general appraisal certificate of the KMB manufacturer.
Substrate pretreatment for HRD (D)-FUFA and HRD (D)-FUF
At the end of the curing time, remove any particles or dust
3
from the surface to be sealed and the mounted fixed
flange.
Remove any oil, grease or concrete slurry residue from the
4
fixed flange.
28
GB

Publicité

Table des Matières
loading

Table des Matières