Hauff-Technik HRD 80-FUFA/o/u Instructions De Montage page 20

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

HRD (D)-FUFA
6
Installation:
Place the flange conduit in the desired position and mark
1
the dowel holes.
The wall around the conduit area must be clean,
smooth, dust-free and dry.
There must be no grooves or nicks in the wall
surface around the conduit area.
The conduit must be clean and free of dust and
grease.
Remove the flange conduit and drill the dowel holes
2
(� 10 mm, 80 mm deep).
There must be a distance of at least 50 mm bet-
ween the dowel holes and the outer edge of the
recess/core drilling.
Position the flange conduit over the dowel holes again.
3
Fit the SXR 10x80 through dowels and tighten the SW13
screws with the torque spanner.
Dowels and screws compliant with ETA-07/0121 approval
Tightening torque for concrete: up to 20 Nm
Tightening torque for masonry: up to 6 Nm
(through dowels are included in scope of delivery)
Use a suitable levelling mortar to level out any uneven
4
patches around the flange.
20
GB
50 mm

Publicité

Table des Matières
loading

Table des Matières