Hauff-Technik HRD 80-FUFA/o/u Instructions De Montage page 27

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

HRD (D)-Z-FUF/FUFA-KMB
3
Description: Z-HRD (D)-FUF/FUFA-KMB accessory set
For waterproofing of buildings with waterproof sheeting or thick coatings that come into contact with
the ground, proceed with fixed/loose flange according to DIN 18195 Part 9: 2010-05 for a sealing
made from a polymer-modified bituminous thick coating (KMB) or waterproof sheeting according
to DIN 18195 Part 2: 2009-04 against standing seepage water and pressing water according to DIN
18195 Part 6: 2011-12 (ref. as black tank).
When using galvanised flanges, a 2K epoxy resin coating and sanding are to be provided on site for
all KMB contact surfaces.
Attention should be paid here to the laying guidelines of the sheeting manufacturers or KMB manufacturers.
4
Scope of delivery
The scope of delivery for the Z-HRD (D)-FUFA-KMB includes:
Sealing fleece
2 mm EPDM rubber inlay
5
Required tools and auxiliaries
To install the Z-HRD (D)-FUFA-KMB correctly, you will need the following tools and auxiliaries in addition to
the usual tools:
trowel
brush
rag
Torque guidelines from sheeting manufacturers/DIN 18195
for tightening loose flanges
Type of entry sheeting/thick coating
When using Hauff Z-HRD (D)-FUFA rubber inlays
For KMB (polymer-modified bituminous thick coatings) in conjunction with
Hauff rubber inlays
Bare bitumen sheeting according to DIN 52129-R 500
PIB bonded with bitumen
Bitumen and polymer bitumen sheeting according to DIN 18195-2: 2009-04,
Table 3, with glass fabric reinforcement
Bitumen and polymer bitumen sheeting according to DIN 18195-2: 2009-04,
Table 3, with polyester fleece or copper strip reinforcement
R 500 N + 1 Cu
ECB, PVC-P, elastomer and EVA sheeting according to DIN 18195-2: 2009-04,
Table 4, bonded with bitumen
R 500 N + 2x Cu
Plastic sheeting according to DIN 18195-2: 2009-04, Table 4, loosely laid
Silicone caps
Installation instructions and general appraisal
certificate from the KMB manufacturer
27
Torque for
Torque for
M12 (Nm)
M20 (Nm)
30
30
12
12
15
20
20
1st tightening: 100
20
1st tightening: 120
30
2nd tightening: 100
3rd tightening: 80
30
GB
80
100
50
50
65
80
80
100

Publicité

Table des Matières
loading

Table des Matières