Handling - Seko Pool Basic Pro Evo Manuel D'installation

Ph-/rx/ph+ - ph/rx/flocc
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Release the cover by pulling the
left connector upward.
Position the roller at 20 past 10,
turning it in the direction of the
circular arrow.
000013791

14. HANDLING

Hose replacement:
Position the roller at 20 past 10,
turning it in the direction of the
circular arrow.
Insert the left connector into the
relative housing and pass the
hose under the roller's guide.
Turn the probe holder in the
direction of the circular arrow,
simultaneously
accompanying
the hose into the pump's head,
until the right connector is
reached.
Rev. 1.0
Completely
release
connector, holding it taut towards the
outside, and turn the roller in the
direction of the circular arrow so that
the hose is freed up to the right
connector.
Arrows indicating the liquid's
direction
Position
the
pump's
according to the direction of the
arrows (▲▼) and press its
surface hard so that it is
properly locked into place.
the
left
cap,
21

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières