Prepare The Site - Kohler K-1107-L Guide D'installation Et D'entretien

Table des Matières

Publicité

1.

Prepare the Site

Position the rough plumbing.
Positionner la plomberie de
raccordement.
Coloque las tuberías de
plomería.
Verify that the subfloor offers adequate
support, and is flat and level.
Vérifier que le sous-plancher offre un support
adéquat et qu'il soit plat et nivelé.
Verifique que el subpiso proporcione suficiente
soporte y que esté plano y nivelado.
Framing
CAUTION: Risk of property damage. Do not support the bath by the rim. The
bath must be supported by the leveling blocks only. If the load weight of the
bath is supported by the perimeter of the bath rim, property damage will occur.
NOTICE: The bath must be installed into an alcove.
NOTICE: Take into account the thickness of the finished wall materials when
constructing the framing.
NOTICE: To ensure the bath does not rest on the rim, frame the floor or construct a
frame for a raised installation. Ensure the bath is supported by the leveling blocks or
bath base only. Refer to the rough-in information packed with this bath.
Construct the framing with 2x4 or 2x6 studs according to the roughing-in
information packed with the bath.
If an apron will be installed, construct the required additional support at this time.
Refer to the installation instructions packed with the apron.
Plumbing
NOTE: For through-the-floor drain installations: A drain hole will need to be cut to
accommodate the drain connections. For above-the-floor drain installations: A hole
will not need to be cut.
Position the plumbing according to the roughing-in sheet packed with the bath.
Cap the supplies and check for leaks.
Attach the drain to the bath according to the drain manufacturer's instructions.
Do not connect the trap at this time.
Place a clean drop cloth on the bottom of the basin area. This will prevent the
surface of the bath from scratching during the installation process.
1084160-2-B
Construct 2x4 or 2x6 stud
framing according to the
roughing-in information.
Construire un cadre de
montant de 2x4 ou de 2x6
suivant l'information du plan
de raccordement.
Construya una estructura de
postes de 2x4 ó 2x6,
conforme al diagrama de
instalación.
6
Kohler Co.

Publicité

Table des Matières
loading

Table des Matières