Horizon Fitness CE4.3 Manuel Du Propriétaire page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY STEP 5
14
LOWER
LINK ARM
LOWER
HANDLEBAR
TEFLON
SPACER
WASHERS
LOWER HANDLEBAR
NUT (K)
LOWER LINK ARM
GUIDE RAIL
TEFLON WASHERS (I)
LOWER
HANDLEBAR
INSIDE
ELBOW
COVER
HARDWARE FOR STEP 5:
BOLT (J)
A
Open HARDWARE BAG FOR STEP 5.
B
Slide SPACER (H) into LOWER LINK ARM.
C
Place TEFLON WASHERS (I) on either side
of SPACER (H). While holding TEFLON
WASHERS (I) slide LOWER LINK ARM into
SPACER (H)
bottom end of LOWER HANDLEBAR.
D
Insert BOLT (J) into LOWER HANDLEBAR and
OUTSIDE
secure using NUT (K).
ELBOW
COVER
E
Attach the outside ELBOW COVER to elbow
joint using 1 SCREW (L).
F
Snap the INSIDE ELBOW COVER onto the
outside elbow cover. Note the position of the
snap tabs before snapping into position.
G
Repeat on other side.
SCREW (L)
BOLT (J)
60 mm
Qty: 2
SPACER (H)
NUT (K)
44 mm
Qty: 2
Qty: 2
TEFLON
WASHER (I)
SCREW (L)
28.4 mm
Qty: 2
Qty: 4

Publicité

Table des Matières
loading

Table des Matières