Maintenance schedule

The sections below describe the maintenance work that is required in order
to ensure the best possible, trouble­free operation of the Tool24 PickOne
DE
goods issue system. If increased wear is noticed during the regular checks,
shorten the required maintenance intervals in accordance with the level of
wear that is actually occurring.
Interval
Daily
Monthly
EN
As required
8.3

Measures after successful maintenance

Following the completion of maintenance work and before the Tool24
PickOne goods issue system is switched back on, the following steps must
FR
be carried out:
1. Check all previously loosened screw connections to make sure that they
2. Check that all previously removed protective fea­tures and covers have
3. Check that all used tools, materials, and other equipment have been
4. Clean the work area and remove any leaked sub­stances such as liquids,
IT
5. Make sure that all of the safety equipment on the Tool24 PickOne goods
ES
116
Maintenance task
Visual inspection for externally visible damage
Cleaning of dust
Cleaning of monitor
Visual inspection of entire system
Check of structural stability
Check of carousel bearing
Service inspection by Hoffmann or by a company
commissioned by Hoffmann
are firmly attached.
been installed again properly.
removed from the work area.
processed material, or similar.
issue system is working per­fectly.
Personnel
User
System admin
Hoffmann