Initial Startup; Erection And Adjustment; Connection; Connection Of The Master System - Hoffmann Garant Tool24 PickOne Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.

Initial startup

6.1

Erection and adjustment

DE
Choose the place of installation.
First, you must choose the plate of installation.
EN
6.2

Connection

FR
6.2.1

Connection of the master system

Connection of power supply
Connect up the country­specific power cable with adapter
IT
as per IEC 60320 C13.
ES
100
Requirements relating to the place of installation
Choose the place of installation of the Tool24 PickOne goods issue system
carefully, taking the following aspects into account:
Space requirement
Protection against damage (for example, forklift)
Ambient conditions
Connection possibilities
Sufficient floor load­bearing capacity
Adjust the Tool24 PickOne goods issue system using the six adjustable
feet (size 17 open­end wrench).
WARNING
Initial startup
The Tool24 PickOne goods issue system is connected to the power supply,
starts up the control unit, and executes a reference run.
Media supply
The external connections are beneath the maintenance opening behind the base
cover of the Tool24 PickOne goods issue system.
see the 3.3 "Ambient conditions" section on page 81
see the 3.2 „Connected values" section on page 80
Power connection

Publicité

Table des Matières
loading

Table des Matières