Télécharger Imprimer la page

GE RAVWPT9SW Instructions D'installation page 3

Les langues disponibles

Les langues disponibles

STEP 3
Plenum Installation
NOTES:
• A properly sized header and rough in framing must
conform to all national and local building codes.
• Before caulking and permanent attachment, dry
fit plenum into the rough opening to check for fit,
squareness and level.
Caulk the wall plenum on the rough opening side of
the wall plenum flange.
* Field Supplied
Parts
Direction of Part B
Installation - from
Inside
Building
Rough
Opening
Installation Instructions
Proper Header*
Direction of Part A
Installation - from
Outside
Proper Caulking*
Proper Header*
Proper
Flashing*
Part B
Installs from
the Inside of
the Building
3
Proper Caulking*
Building
rough
opening
Outside
Wall
Proper Flashing*
Part A Installs
from the
Outside of
the Building
loading