Drill Holes; Wall Or Ceiling Installation; Installation Of Extraction Duct - Helios Mini Vent M1/100 N/C Notice De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operation Instructions
UK
ATTENTION
NOTE
MiniVent M1/100/120 N / C
3.2

Drill holes

Set casing against the wall, mark the holes and drill. Fasten with at least 2 screws and plugs.
For surface installation the casing is provided with a side entry knockout (Fig.5, Pos.1) for the cable!
The mains supply cable is to be kept in such a way that no ingress of moisture is made possible along the
cable.
3.3

Wall or ceiling installation

fig.4
With installation of the device, the
guide vane š must be mounted
vertically (as shown). Snaps into
place every 90° rotation.
š
vertical
3.4

Installation of extraction duct

Extraction ducts, which are installed in cold zones, must be isolated. With heavily occurring condensate, a "water
pocket" in the duct system must be integrated in an appropriate way.
fig.5
Affix the
rubber foam
Œ
Back dr-
aught
Œ
Break out entry
shutter ›
knockout for cable.
removable

Ceiling suspension
Guide vane š
pre-cut drillings because of possible
removable
condensate formation.
4

Ž


Publicité

Table des Matières
loading

Table des Matières