Hydraulic Installation; Electrical Installation - Seko KRONOS 50 Manuel D'installation

Pompe de dosage péristaltique actionnée par un moteur pas-à-pas
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5. INSTALLATION
1.
Mark the bore holes on the wall
2.
Drill the Ø 8 mm holes and insert the dowels supplied
3.
Fix the bracket to the wall
4.
Hook the device at the top
Fixing template

6. HYDRAULIC INSTALLATION

Mount the suction and discharge lines:
1. Cut off the ends of the hoses so that they are straight.
2. Screw on the cap nut and slide over the hose.
3. Screw in the hose end until it stops over the nozzle.
4. Connect the discharge line to the right- hand hose connection.
5. Connect the suction line to the left-hand hose connection.
6. Tighten up the cap nuts.
7. To do this, shorten the free end of the suction line so that the end hangs just above the container bottom.
8. If necessary, feed a hose line from the leakage fitting to the container.

7. ELECTRICAL INSTALLATION

1.
Lay a power cable with short-circuit protection and mains switch - if necessary, with emer‐ gency stop
switch.
2.
Ensure that the mains power cable is dead and remains so!
3.
Break out the small bore hole at the far right on the lower side of the back section by means of a
screwdriver.
4.
Screw in the corresponding screw and tighten up - not the scalping screw.
5.
Insert the reducing inserts depending on the cable diameter being used and insert the threaded
assembly.
6.
Feed the mains cable into the threaded assembly.
7.
Connect the mains cable to terminal block.
8.
Tighten up the clamping screw so that the threaded assembly is moisture-proof.
0000137630
Rev. 4.2
4

Publicité

Table des Matières
loading

Table des Matières