Putting Into Operation; Pressure Test; Setting The Working Pressure - GF 582 High Purity Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Instruction manual

10 Putting into operation

10.1

Pressure test

 Ensure that the test pressure does not exceed 1.1 times the max. set back
pressure.
10.2

Setting the working pressure

 Remove the cap from the bonnet assembly (top part), see Fig. 2.
To do so, position the screw driver in the notch of the cap.
Fig. 2
 Loosen the locking nut, see Fig. 3
Fig. 3
 In order to increase the setpoint value: Tense the spring.
To do so, turn the spindle clockwise, see Fig. 4
Fig. 4
42
1 ½
turns
Putting into operation

Publicité

Table des Matières
loading

Table des Matières