TOOLS NEEDED FOR INSTALLATION

• Saber Saw or Jig Saw
• Drill
• 1 1/4" Wood Drill Bit
• Pliers
• Phillips Screwdriver
• Wire Stripper or Utility Knife
• Metal Snips
• Measuring Tape or Ruler
• Level
• Pencil
• Caulking Gun
• Duct Tape
PARTS SUPPLIED FOR INSTALLATION
• 1 Backdraft Damper
• 1 Vent Grate (for recirculating installations only)
• 1 Vinyl Trim
• 1 Literature Package
PARTS NEEDED FOR INSTALLATION
• 2 Conduit Connectors
• Power Supply Cable
• 1 Wall or Roof Cap
• All Metal Ductwork
PLAN THE DUCTWORK
The KTV30XV slideout rangehood is designed
to offer wide flexibility of installations. The
rangehood can be ducted vertically or
horizontally through a 6" round vent. The
unit can also be installed in a recirculating
configuration. The unit comes standard in
the top venting position. FIGURES 1 and
2 show vertical and horizontal installations
for this unit. FIGURE 3 shows recirculating
installation.
The KTV30XV requires 6" round ductwork. To
ensure that the blower performs to its highest
possible capacity, ductwork should be as
short and straight as possilbe.
For satisfactory performance the duct run
should not exceed 50 equivalent feet if
ducted using the
required minimum 6" round duct. The
equivalent feet in FIGURE A for each piece
of duct in the system An example is given
in FIGURE B. For best results, use no
more than three 90° elbows. Make sure
that there is a minimum of 24" of straight
duct between elbows if more than one is
used. Do not install two elbows together.
If you must elbow right away, do it as far
away from the hood's exhaust opening as
possible.
45˚ Elbow
90˚ Elbow
90˚ Flat Elbow
Wall Cap
FIGURE A
9 Feet Straight Duct
2 - 90˚ Elbows
Wall Cap
Total System
FIGURE B
3.0 feet
5.0 feet
12.0 feet
0.0 feet
9.0 feet
10.0 feet
0.0 feet
19.0 feet