iX-5/iX-7 Series
Meter Replacement Guide
For more information or if you experience
any issues please visit :
iX-5 :
kb.quadient.ca/ix5_en
iX-7 :
kb.quadient.ca/ix7_en
1. Remove the Meter From your Original Mailing System
1
Turn off the mailing system by
pressing the power switch.
2. Unpack your Replacement
Remove replacement meter from box and place
original meter back into box and prepare for return
4. Switch On the System
1
Turn on the power to mailing system
by pressing the power switch.
Congratulations
2
Remove the weighing platform
shelf (if applicable)
system base.
3. Insert the Meter
The meter
serial
number
is located
here
Place the meter into the meter bay
into position (c). Close the mailing system cover.
2
Swap meter
This procedure allows to install
your new meter in the machine
Once the mailing system is powered on, follow the
steps on the screen to complete the swap process.
Your mailing system is ready to use!
(a)
and
(c)
from the mailing
3
Lift the cover of the mailing system
and
remove the meter PSD (b).
C
(b)
and slide in until it fits securely
OK