Solar Solution
1
DETAIL DESCRIPTION
Avoid location in the shade of the tree or building
page
www.lumec.com
Installation Instructions
Installation best practice
1.
In daytime, sunlight should shine on the PV panel directly
without any shade and blocking, otherwise it will not work
for charging and harm the battery lifetime.
2.
First Installation should avoid deeply discharge the
battery, installing in daytime or recharge the battery
before installation, or shut down the luminaire in first
night.
3.
Protect all the connectors during installation away from
sand and potential impurity for in ground, desert, soil and
mud environment. Connectors are forbidden to be
repaired when the cover is broken in the site, should be
replaced.
4.
Do not use any type of solvent for cleaning and be careful
not to put too much pressure on the panel while cleaning.
12NCs-Rx