Station Installation - Ecovacs Goat O800 Rtk Manuel D'instructions

Masquer les pouces Voir aussi pour GOAT O800 RTK:
Table des Matières
Les langues disponibles

Les langues disponibles

3.2 Station Installation

Install the Charging Station
1
1. Ensure the Charging Station is in a place with strong Wi-Fi signal for
better remote control.
2. Place the Charging Station on an open and flat lawn, avoiding any
slope, rocks, or shadow coverage. Ensure that there are no objects (e.g.,
fences or plants) within 40cm (15.75") on either side and 2m (6.56') in
front.
18
EN
3. Make sure that the grass around the Charging Station is no longer
than 6cm (2.36"). Overgrown grass may affect recharging.
6cm
4. If you want to fix the Charging Station to the ground, use the
Charging Station Fastening Pegs and the Allen key.
Note:
You may want to do this after you have settled down everything.
(2.36")
Table des Matières
loading

Ce manuel est également adapté pour:

Goat o1200 rtk

Table des Matières