Maintenance; High Duty Operation Maintenance - Seeley LCQ Manuel Du Propriétaire

Climatiseur par évaporation
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 30

MAINTENANCE

WARNING! As your cooler is mounted on
the roof, we suggest that any maintenance
or checks be carried out by an authorised
Seeley International dealer or service agent.
Climbing onto the roof can be hazardous
and could result in injury to you and
damage to your property.
For gaining access to the cooler refer to the
Removing Pad Frame section. For LCS/TBS
and TBSI coolers refer to the Pad Frame
Positions section when refitting the pads.
Maintenance Schedule servicing is essential to
ensure the cooler operates efficiently for many
years. It must be carried out by a qualified,
licensed service technician. The following
pages outline the suitable maintenance
requirements to ensure that your cooler
continues to operate efficiently.
We require that the following components
and the operation thereof, be checked/
serviced after the first year, then every 2
years for residential purposes, or every year
for commercial purposes, as Maintenance
Schedule servicing. Refer to the Maintenance
Schedule section.
High Duty Cycle Operation
Maintenance
Only applicable for coolers operating
more than 12 hours per day continuously
throughout the year.
The following maintenance program is required
in addition to the servicing required by the
Maintenance Schedule:
6 monthly maintenance:
• Inspect the cooler and check the pump,
drain valve (if fitted), solenoid and fan motor.
• Check the pads and replace as required.
• Check and clean the tank and the pump
filter.
12 monthly maintenance:
• Replace plastic fan and motor collet and
check motor shaft for wear.
• Water distribution channels.
• Pump.
• Drain valve.
• Solenoid and associated filter / fittings.
• Fan motor operation.
• Float valve.
• Salinity probes etc
Maintenance Schedule servicing should be
performed before the summer season. It is
important to note that all evaporative coolers
have components that may need periodic
replacement (eg. filter pads, hoses, o-rings
etc).
Note! Failure to carry out the Maintenance
Schedule services will void your warranty
cover.
Note! Maintenance Schedule servicing
may be required more frequently in adverse
environmental situations or where the
appliance is installed in non-domestic
applications. Please consult with the installer
or service personnel to determine if more
frequent servicing is required.
LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI |
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

LcsLcqiBmqCpqTbqTbs ... Afficher tout

Table des Matières