INSTALLATION OF THE APPLIANCE

The Connect AT/BT can be wall-mounted or "built-in", and can be
located near the boiler or at a distance, provided the length of the
plumbing and electrical connections between the boiler and the
Connect AT/BT unit do not exceed 15 metres.
The Connect AT/BT unit must not be installed in positions exposed
to the weather (rain, sun, ice, etc.). The place in which the Connect
AT/BT is installed must be suitable for equipment with a protection
level of IP10D.
Note: The wiring supplied is 2 metres long.
Wall-mounted installation
When the Connect AT/BT is wall-mounted it must be supported by
two expanding wall anchors (supplied) that are suitable for the
type of wall and weight of the equipment.
We recommend using pipe sleeves built into the wall in order to
limit the infiltration of water.
These pipe sleeves are not supplied with the unit.
"Built-in" installation
When the Connect AT/BT unit is built-in:
- Provide the building work, complete with a niche of suitable
size for the Connect AT/BT, to suit the thickness of the wall
(minimum indicative dimensions shown in the figure).
- Position the Connect AT/BT in position, and remember to open
out the two support lugs to fix it more securely.
- Protect the side edges and front while building in the device.
Since the plumbing and electrical connections between the system
and the Connect AT/BT must be contained within the overall size
of the device itself, first position the Connect AT/BT and then the
entry and exit pipes for the system and the conduiting for the electric
cables.