1.20 Commissioning
Under the commissioning menu it is possible to adjust the several parameters:
Unit test run: (Not available for YUTAKI Cascade Controller)
• Duration
• Mode (not available for heating only)
• Start test run
Air purge procedure: (Not available for YUTAKI Cascade Controller)
• Duration
• Start air purge
Screed Drying:
• Circuit 1 setting temperature
• Circuit 2 setting temperature
• Start screed drying
PMEN0597 rev.1 - 06/2023
Pump down procedure: (Not available
for YUTAKI Cascade Controller)
• Duration
• Start pump down