Installation

Foundation for Installation
• Fix the unit tightly with bolts as shown below so that unit will not fall down due to earthquake or gust.
• Use the H-beam support as a base support
• Noise and vibration may occur from the floor or wall since vibration is transferred through the installation part depending
on installation status. Thus, use anti-vibration materials (cushion pad) fully (The base pad shall be more than
200 mm (7-7/8 inch)).
H-Beam
If it is necessary to prevent the unit from falling over, install as shown in the figure.
• Prepare all 4 wires as indicated in the drawing
• Unscrew the top plate at the 4 location indicated A and B
• Put the screws through the nooses and screw them back tight
Spring washer
Concrete
Frame
Nut
base
Foundation bolt executing method
A
C
Anti-vibration
materials
Four bolt are
required
3 thread ridges
B
A : Location of the 2 fixation holes on
the front side of the unit
B : Location of the 2 fixation holes on
the rear side of the unit
C : wires
Installation
Installation Manual 19