LoRaWAN PULSE - Mode d'emploi / User guide version V1.6.1
together and will enable protection level IP67 to be ensured.
Packing gland nut
•
Finish the assembly by locking the packing gland's nut in position
2.6. Starting up the product using a magnet
Once the product has been configured and its assembly has been finalised, the product is ready to be started up.
The start-up is carried out using a magnet which you place on the upper part of the product (cf. the diagram below). The magnet must be held
in position for at least 6 seconds so as to confirm the start-up of the product.
Once the LoRaWAN PULSE unit validates its start-up, iit immediately transmits status frames followed by a data frame (according the defined
periodicity).
Position of the magnet for
starting up the product
Page
33
of 41